Miagu logo
Cost / 1,000 units
$222.92
$1.34M per year
Good output
2,023/h
Filler rated 2,955/h
OEE
62.7%
Incl. changeovers
Shifts needed
2
3,241 of 3,750 h
Installed capex
$1.41M
Crew 5.5 per shift
Constraint
Unscramble
76% active · 2% down

Live line replay

First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.

runningUnscramble46 bpm20 srunningRinse91 bpm20 srunningFill49 bpm15 srunningCap58 bpm20 srunningLabel76 bpm20 srunningInspect118 bpm20 srunningCase pack68 bpm30 srunningPalletize86 bpmUnits out: 1
00:00
RunningStarvedBlockedDown

Line configuration

Edit any machine — the twin re-runs a 24-hour simulation on every change.

MachineRated bpmMTBF minMTTR minAvail.RunningDownCapexBuffer after
Unscrambler
Constraint
94.8%74.1%2.3%$97k
Air rinser
98.0%37.4%1.3%$66k
Filler · Piston
= 49
616.091.0%69.2%5.6%$200k
Capper
90.9%58.7%3.9%$98k
Labeler
90.9%44.8%7.1%$92k
Checkweigh + vision
99.0%28.9%0.7%$89k
Case packer
84.8%50.1%7.5%$171k
Palletizer
93.8%39.6%5.3%$181k
Fill σ 0.50% · changeover 55 min