Miagu logo
Cost / 1,000 units
$89.30
$2.23M per year
Good output
6,761/h
Filler rated 11,027/h
OEE
58.4%
Incl. changeovers
Shifts needed
3
3,881 of 5,625 h
Installed capex
$3.18M
Crew 5.5 per shift
Constraint
Case pack
79% active · 10% down

Live line replay

First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.

runningUnscramble225 bpm20 srunningRinse311 bpm20 srunningFill184 bpm15 srunningCap218 bpm20 srunningLabel282 bpm20 srunningInspect468 bpm20 srunningCase pack164 bpm30 srunningPalletize321 bpmUnits out: 5
00:00
RunningStarvedBlockedDown

Line configuration

Edit any machine — the twin re-runs a 24-hour simulation on every change.

MachineRated bpmMTBF minMTTR minAvail.RunningDownCapexBuffer after
Unscrambler
94.8%50.6%1.5%$271k
Air rinser
98.0%36.6%1.3%$146k
Filler · Piston
= 184
346.085.0%62.0%10.1%$548k
Capper
90.9%52.3%2.9%$232k
Labeler
90.9%40.4%6.4%$216k
Checkweigh + vision
99.0%24.3%0.5%$218k
Case packer
Constraint
84.8%69.4%9.6%$303k
Palletizer
93.8%35.5%5.1%$427k
Fill σ 0.50% · changeover 55 min