Cost / 1,000 units
$116.08
$1.16M per year
Good output
3,465/h
Filler rated 5,089/h
OEE
63.1%
Incl. changeovers
Shifts needed
2
3,115 of 3,750 h
Installed capex
$1.83M
Crew 5.5 per shift
Constraint
Unscramble
76% active · 2% down

Live line replay

First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.

runningUnscramble79 bpm20 srunningRinse148 bpm20 srunningFill85 bpm15 srunningCap95 bpm20 srunningLabel127 bpm20 srunningInspect216 bpm20 srunningCase pack115 bpm30 srunningPalletize148 bpmUnits out: 2
00:00
RunningStarvedBlockedDown

Line configuration

Edit any machine — the twin re-runs a 24-hour simulation on every change.

MachineRated bpmMTBF minMTTR minAvail.RunningDownCapexBuffer after
Unscrambler
Constraint
94.8%73.8%2.3%$137k
Air rinser
98.0%39.4%1.3%$90k
Filler · Piston
= 85
616.091.0%68.8%5.5%$200k
Capper
90.9%61.4%4.5%$135k
Labeler
90.9%45.9%7.1%$128k
Checkweigh + vision
99.0%27.0%0.5%$132k
Case packer
84.8%50.8%7.5%$241k
Palletizer
93.8%39.4%5.3%$258k
Fill σ 0.50% · changeover 55 min