Miagu logo
Cost / 1,000 units
$141.68
$1.42M per year
Good output
2,909/h
Filler rated 4,378/h
OEE
63.9%
Incl. changeovers
Shifts needed
2
3,575 of 3,750 h
Installed capex
$1.83M
Crew 5.5 per shift
Constraint
Unscramble
74% active · 2% down

Live line replay

First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.

runningUnscramble68 bpm20 srunningRinse131 bpm20 srunningFill73 bpm15 srunningCap81 bpm20 srunningLabel99 bpm20 srunningInspect175 bpm20 srunningCase pack96 bpm30 srunningPalletize123 bpmUnits out: 2
00:00
RunningStarvedBlockedDown

Line configuration

Edit any machine — the twin re-runs a 24-hour simulation on every change.

MachineRated bpmMTBF minMTTR minAvail.RunningDownCapexBuffer after
Unscrambler
Constraint
94.8%72.0%2.3%$125k
Air rinser
98.0%37.4%1.3%$83k
Filler · Piston
= 73
486.088.8%67.1%7.0%$320k
Capper
90.9%60.5%4.5%$122k
Labeler
90.9%49.5%7.6%$109k
Checkweigh + vision
99.0%28.0%0.5%$115k
Case packer
84.8%51.1%7.5%$214k
Palletizer
93.8%39.9%5.3%$229k
Fill σ 0.50% · changeover 55 min