Miagu logo
Cost / 1,000 units
$245.00
$1.47M per year
Good output
2,163/h
Filler rated 3,453/h
OEE
53.7%
Incl. changeovers
Shifts needed
2
3,233 of 3,750 h
Installed capex
$1.41M
Crew 5.5 per shift
Constraint
Case pack
82% active · 11% down

Live line replay

First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.

runningUnscramble73 bpm20 srunningRinse97 bpm20 srunningFill58 bpm15 srunningCap62 bpm20 srunningLabel78 bpm20 srunningInspect130 bpm20 srunningCase pack51 bpm30 srunningPalletize104 bpmUnits out: 2
00:00
RunningStarvedBlockedDown

Line configuration

Edit any machine — the twin re-runs a 24-hour simulation on every change.

MachineRated bpmMTBF minMTTR minAvail.RunningDownCapexBuffer after
Unscrambler
94.8%50.0%1.5%$130k
Air rinser
98.0%37.6%1.3%$69k
Filler · Piston
= 58
666.091.7%63.3%4.3%$164k
Capper
90.9%58.8%3.9%$103k
Labeler
90.9%46.7%7.1%$94k
Checkweigh + vision
99.0%28.0%0.5%$95k
Case packer
Constraint
84.8%71.4%11.0%$142k
Palletizer
93.8%35.0%5.1%$205k
Fill σ 0.50% · changeover 55 min