Miagu logo
Cost / 1,000 units
$414.49
$1.04M per year
Good output
1,796/h
Filler rated 2,696/h
OEE
50.1%
Incl. changeovers
Shifts needed
1
1,850 of 1,875 h
Installed capex
$1.30M
Crew 5.5 per shift
Constraint
Label
82% active · 10% down

Live line replay

First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.

runningUnscramble62 bpm20 srunningRinse81 bpm20 srunningFill45 bpm15 srunningCap55 bpm20 srunningLabel42 bpm20 srunningInspect108 bpm20 srunningCase pack62 bpm30 srunningPalletize78 bpmUnits out: 1
00:00
RunningStarvedBlockedDown

Line configuration

Edit any machine — the twin re-runs a 24-hour simulation on every change.

MachineRated bpmMTBF minMTTR minAvail.RunningDownCapexBuffer after
Unscrambler
94.8%48.9%1.5%$117k
Air rinser
98.0%37.4%1.3%$61k
Filler · Piston
= 45
666.091.7%67.4%4.3%$164k
Capper
90.9%55.0%3.1%$95k
Labeler
Constraint
90.9%72.1%9.6%$63k
Checkweigh + vision
99.0%28.0%0.5%$84k
Case packer
84.8%48.8%6.6%$161k
Palletizer
93.8%38.8%5.3%$170k
Fill σ 0.50% · changeover 55 min