Cost / 1,000 units
$111.10
$2.00M per year
Good output
5,011/h
Filler rated 7,995/h
OEE
59.6%
Incl. changeovers
Shifts needed
3
3,776 of 5,625 h
Installed capex
$2.71M
Crew 5.5 per shift
Constraint
Label
78% active · 10% down
Live line replay
First 60 minutes of the simulated shift. Colour shows machine state, bars show accumulation between machines. The dashed outline marks the constraint.
00:00
RunningStarvedBlockedDown
Line configuration
Edit any machine — the twin re-runs a 24-hour simulation on every change.
| Machine | Rated bpm | MTBF min | MTTR min | Avail. | Running | Down | Capex | Buffer after |
|---|---|---|---|---|---|---|---|---|
Unscrambler | 94.8% | 50.2% | 1.5% | $224k | ||||
Air rinser | 98.0% | 34.2% | 0.5% | $126k | ||||
Filler · Piston | = 133 | 37 | 6.0 | 86.0% | 63.3% | 9.2% | $488k | |
Capper | 90.9% | 55.1% | 3.7% | $185k | ||||
Labeler Constraint | 90.9% | 68.1% | 9.6% | $127k | ||||
Checkweigh + vision | 99.0% | 24.9% | 0.5% | $177k | ||||
Case packer | 84.8% | 46.9% | 6.2% | $322k | ||||
Palletizer | 93.8% | 36.2% | 5.1% | $347k |
Fill σ 0.50% · changeover 55 min
